Know what changed. Decide what happens next.

BuildSift Brain turns supplied schedule and project updates into clear answers, early risk signals and review-ready actions — so PMs can keep the job moving without rebuilding the whole story.

Synthetic preview only. Do not enter real project or personal data.

BrainBellevue
PM

What does the Bellevue framing delay affect?

Brain
  1. Wall sheeting moves by 3 working days.
  2. First fix shifts by 2 days.
Sources (3)
  • Builder update — 17 May
  • Updated programme — v12
  • Daily log — 16 May

Draft only — nothing sent.

Proposed actionConfirm the programme change
Review required

Confirm the proposed re-sequence for wall sheeting and rough-in.

Linked impactHandover moves by 3 working days
Source evidence
Builder update — 17 May
Updated programme — v12
Daily log — 16 May
Unknown

Structural steel delivery date is not confirmed.

From field update to reviewed action.

Brain connects supplied project context to the downstream work, keeps the evidence attached and drafts the next move for the PM to decide.

  1. 1

    Project update

    A supplied site update says framing has moved and a delivery still needs confirmation.

    Builder update · 17 May
  2. 2

    Brain finds the signal

    The delay is connected to the supplied programme and downstream work.

    Impact found · +3 working days
  3. 3

    A clear action is drafted

    Brain prepares a concise follow-up with the reason and next step attached.

    Draft · not sent
  4. 4

    The PM decides

    The PM opens the evidence, adjusts if needed, then reviews, edits or dismisses.

    Human decision required

One answer. The right level of detail.

Brain keeps the facts consistent while the app gives PMs the evidence and the phone view keeps the answer concise.

Bellevue — Framing delayReview
Proposed action

Confirm the proposed re-sequence for wall sheeting and rough-in.

Handover moves by 3 working days
Source evidence

Updated programme — v12

Daily log — 16 May

Copy-ready viewFraming delay

Wall sheeting moves by 3 working days.

First fix shifts by 2 days.

Draft only

Copy-ready preview — nothing is sent without review.

Built for review, not blind automation.

1

Evidence stays attached.

Open the supplied sources, last-updated detail and reason behind a proposed action.

2

Unknowns stay visible.

Brain says what is missing instead of filling the gap with a confident guess.

3

Drafts stay drafts until the PM decides.

Review, edit or dismiss the next move before it becomes project work.

Useful now. Built for the harder coordination work next.

The synthetic preview shows the review-first core. The wider product direction is clearly separated below.

Available in the synthetic preview

  • Ask what needs attention over the next 14 days.
  • See which supplied tasks a delay affects.
  • Draft a follow-up for review.
  • Open the sources, freshness and missing information behind an answer.

What we’re building

  • Supported schedule import and daily action packs.
  • Repeatable delay-recovery workflows.
  • Project-system-ready notes and field-message delivery.
  • Focused action pages for inspections and other site tasks.

Private alpha

Brain

Project questions, early signals and review-ready actions with the evidence kept in view.

Open synthetic Brain

Coming soon

Safety

Custom site checklists by QR, with no app required for field teams and clear timestamped records for coordinators. Designed to reduce checklist administration, not replace the builder’s safety responsibilities.

See the Brain before it hits the site.

Explore the synthetic example, or talk to us about the coordination work that keeps following your PMs home.